Your operation, connected.
AIM moves it forward.

From the first operational record to the next decision, AIM connects what your mine knows with what needs to happen. Work stays coordinated. Issues trigger action. Your teams move with the same context.

Follow the flow
01 / CONNECT YOUR OPERATION

A shared understanding.
Across the whole mine.

AIM brings people, machines, fuel, purchasing and stock into one operational system. Records connect to the work they support, so a machine, a crew and a material request become part of the same story.

Where your site already uses ERP, fleet or telemetry systems, we assess the interfaces needed to bring that context into AIM.

Less time reconciling records.
More time moving the operation forward.
ONE OPERATIONAL CONTEXT
WorkforceAttendance & availability
MachineryStatus & assignments
FuelStock & consumption
ProcurementRequests & orders
InventoryParts & supplies
AIMThe plan. The resources. The work.

Connected records carry their context between teams.

02 / TURN TARGETS INTO COORDINATED WORK

The target becomes
everyone’s next step.

Set the production direction. AIM connects the work cycles, resource requirements and shift programs behind it. It creates and assigns recurring tasks from shift programs, keeping the plan and the work linked.

Attendance, machine availability and supplies stay in context, giving supervisors the information to allocate work around what is actually ready.

Clear assignments. Visible ownership.
A shift that starts with a shared direction.
NORTH PIT / DAY SHIFT Demo
PRODUCTION TARGET2,400 tonnes

Extraction → Haulage → Stockpile

156 / 164Crew confirmed21 / 24Machines available
North pit haulage cycleEquipment · Crew · Destination
Assigned
Shift inspectionCreated from the shift program
AIM
03 / SEE WHAT NEEDS ATTENTION

Know where the shift stands.
Understand what is behind it.

AIM brings progress, equipment status and crew coverage together. The dashboard puts operational priorities in view, while AIM Vision adds the terrain, routes and equipment behind the work.

Today

12 Oct 2026 · 10:30

Day Shift · 06:00–18:00

SiteMiningHaulageMaintenanceProcessingSecurity
Blast window: East Zone 14:00–14:30 · work automatically held in this zone Partly cloudy · 29°C · wind 8 km/h · lifts OK, roads OK
Are we on pace?Watch

North Pit needs a recovery move

840 of 2,400 t · forecast 2,240 t by 18:00 — 160 t short

5-shift production pace · avg 96%
Anything broken?Alert

1 machine down, 2 tasks blocked

21 of 24 machines available · 2 in planned service · Truck 07 back ~12:00

5-shift availability · avg 92%
Anyone missing?Watch

8 check-ins need confirmation

156 of 164 confirmed on the current shift · evening coverage 48/52 · four positions to fill

156 / 164 confirmed now

Needs you

Approve Truck 12 for two recovery cycles at North PitAIM recovery suggestion · Operations + Fleet · 10:22
Review four open positions for the evening shiftShift coverage · Workforce · 10:18
Review the hydraulic hose request linked to Truck 07Problem Resolver → Workshop → Inventory · 10:24
Open cross-department requests (6)1 overdue2 due soon3 on time

Operations · Today

04 / LET AIM MOVE THE RESPONSE FORWARD

A problem is reported.
AIM gets the response moving.

AIM creates and assigns corrective tasks automatically, with the equipment, location and original work attached. The workshop receives the context. Operations can see the affected work. Parts requests stay linked to the repair.

One report. A coordinated response.

Follow the work from the operator to the workshop — and back to the operation.

INTERACTIVE EXAMPLE
SAMPLE DATA
01 / THE TRIGGER

One report. The full context.

An operator reports a hydraulic fault on Truck 07. The equipment, haulage task and location are already linked to the issue.

Reported by the operator
THE REPORTED ISSUETruck 07 · Hydraulic faultNorth pit / Haulage
Reported
PROBLEM RESOLVERNext: automatic response
CORRECTIVE TASK

Inspect hydraulic system

Workshop teamAssigned when the rule triggers
ONE CONNECTED RECORD
FleetEquipment statusOperationsOriginal task & progressHandoverWork & next actions
05 / UNDERSTAND. IMPROVE. REPEAT.

The next decision
starts with more insight.

Ask why haulage is behind plan, where fuel use has changed or whether the next shift is covered. Ask AIM brings relevant operational records into a plain-language answer, helping your team understand what needs attention.

AIM keeps progress, outstanding tasks and handover context connected. The next shift can pick up the work with a clearer view of priorities and responsibility.

Less searching. Clearer decisions.
Every shift builds on what came before.
Explore Ask AIM
Ask AIM

Ask about coverage, fuel, machines, camp, inventory — or what needs your decision today.

Send
Answers and cases are scoped to your role
Demo

Built around the way
your mine works.

AIM completed a pilot with Migop Mining in Ghana. We bring that field experience into a rollout shaped around your operation.

  1. 01

    Start with the operational challenge.

    Review your workflows and agree where better visibility, coordination and automation can help.

  2. 02

    Connect the context that matters.

    Define the modules, records, roles, operational rules and integration scope with your team.

  3. 03

    Put it to work. Measure the change.

    Agree a baseline for productive hours, fuel use, downtime and plan attainment, then review the impact in operation.

Your operation.
Let’s make it more efficient.

Bring a production workflow, a dispatch challenge or a recurring delay. We’ll walk through how AIM connects the plan, the response and the follow-through.

LET’S TALK ABOUT YOUR OPERATION

See AIM for your operation.

Tell us about the work you want to improve. We’ll arrange a walkthrough focused on your workflows, existing systems and priorities.

Prefer email? Write to contact@honestdig.io.